Project Detail
Concrete Road Construction
Rigid pathways connecting schools, villages, and essential services through flood-sensitive rural terrain.

Duration
5 Months
Project Cost
To be shared
The project improved daily mobility for students and local residents by replacing unstable seasonal pathways with a durable, safer concrete corridor.
Back to Projects